What this guide covers
How to evaluate and select a network cabling partner for homes and small offices. We outline a simple rubric you can reuse: scope clarity, code/safety, documentation, migration plan, and support. Use it to compare bids apples-to-apples and avoid surprises.
Start with outcomes, not parts
Great installs are defined by reliability and clarity: smooth calls, consistent Wi-Fi, tidy labeled racks, and documented ports. Parts matter, but process and workmanship matter more. Ask vendors to state outcomes and how they’ll validate them — not just a box list.
- Reliable roaming and even coverage
- Labeled patch panels and drops with a legend
- Backups of gateway/switch configs after handoff
- Clear support path and change control
The five-part selection rubric
- Scope clarity: drawing with drop counts, rack location, AP positions
- Code and safety: jacket type (riser/plenum), fire-stops, low-voltage practice
- Documentation: labels, port legend, basic “as-built” diagram
- Migration plan: how they’ll cut over with minimal downtime
- Support & maintenance: updates, backups, and who to call
Questions to ask (and answers to look for)
- How will you plan AP placement? → Predictive + on-site validation, not guesswork
- Will you label and provide a port legend? → Yes, including room names and positions
- How do you handle updates and backups? → Staged, with config snapshots and rollback
- How do you secure remote support? → No risky port forwards; use secure tunnels
- What’s your timeline and cut-over plan? → Phased work, after hours if needed
What a good proposal includes
- Short description of goals and constraints
- Drawing or list: rooms, drops, APs, rack, conduit where useful
- Hardware model families (not brand-locked upsells)
- Labor phases (pre-wire, trim, validation)
- Deliverables: labels, legend, config backups, admin guide
Red flags to avoid
- Consumer routers “to save money” for business needs
- No labels or legend — “we’ll figure it out later”
- Everything over Wi-Fi when wiring is practical
- Open port forwards for remote access
- No mention of updates, backups or documentation
How we work (example baseline)
We start with a short discovery, create a simple drawing, and confirm run counts and AP locations. Install routes are planned with the right jacket type and fire-stopping, and racks are dressed and labeled. We validate Wi-Fi channels/power, test drops, provide a port legend and configuration backups, and enable secure remote support only when approved. Maintenance options keep systems predictable with staged updates and periodic health checks.
FAQs
Do I need a certifier?
Continuity tests find wiring faults; certification validates performance. For commercial leases or sensitive workloads, certification can be required.
Will you work after hours?
Yes. We phase cut-overs after hours when needed to avoid downtime.
Can you reuse existing wiring?
Where viable, yes — we test and document, replacing only what holds the system back.
Checklist
- Ask for a drawing with drop counts and AP placement
- Confirm jacket type, fire-stops and low-voltage practices
- Require labels, a port legend and config backups
- Get a simple cut-over plan with timings
- Agree how updates and support will work after install
Example scoring matrix (simple and effective)
| Criteria | Weight | Vendor A | Vendor B | Vendor C |
|---|---|---|---|---|
| Scope clarity (drawing + counts) | 25% | |||
| Code & safety (jacket, fire-stops) | 15% | |||
| Documentation (labels, legend, backups) | 20% | |||
| Migration plan (downtime) | 15% | |||
| Support & maintenance | 15% | |||
| Value (total cost vs deliverables) | 10% |
Use this table to compare proposals objectively. Fill each cell with 1–5 and multiply by weight. The winner should be clear — not just the lowest price, but the best fit for your outcomes.
Sample RFP language you can copy
We request a proposal for structured cabling and Wi-Fi improvements covering: (1) a drawing with room names, drop counts and AP locations, (2) materials list including jacket types, (3) installation methods including fire-stopping, (4) labeling standard and a port legend, (5) configuration backup and documentation deliverables, (6) a cut-over plan including any downtime, and (7) a post-install support plan. Please include optional pricing for Cat6A uplinks and certification testing.
Case study: office upgrade without downtime
A Westchester professional office needed 16 new drops, two ceiling APs and a tidy rack — but could not afford downtime. Our plan: pre-wire after hours, dress and label the rack, configure a new gateway and PoE switch in parallel, then perform a one-hour cut-over early morning. We validated Wi-Fi channels/power and left a port legend and config backups. Staff arrived to stable Wi-Fi, mapped printers and a clean network diagram — no disruption, no guesswork.
Engagement models and pricing transparency
- Fixed-scope install with a clear deliverables list
- Time & materials for discovery/unknowns with caps
- Phased approach: pre-wire, trim, validation and optional certification
For predictable projects we prefer a fixed scope with crisp deliverables. Where conditions are unknown (older plaster/lathe walls, hidden chases), a small T&M discovery reduces risk before fixing scope. Phasing helps teams and budgets — you see value at each step and we de-risk surprises.
Aftercare: what good maintenance looks like
- Periodic firmware updates (staged and verified)
- Config backups stored safely after every change
- Quarterly health checks for signal, errors and logs
- Clear change control so the network stays predictable
Why documentation pays for itself
Documentation is the cheapest performance upgrade you can buy. A labeled rack and a one-page legend turn mysteries into five-minute fixes and prevent vendor lock-in. Any competent tech can see where a drop goes and what a port does — which means faster support and less downtime years from now.
Need help with How to Choose a Good Network Installation & Cabling Company?
Get a fast quote and see how we design and install this service in Westchester County, NY.
